Laserfiche WebLink
SWRCB,January 2002 <br /> Page of <br /> 11. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not E ui ed With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested N (See Comments!) <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Li Industry Standard ❑Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: ❑Pressure ❑Vacuum <br /> ❑Hydrostatic <br /> ❑Other(Specify) <br /> Tc st rquipment[Ised: Equipment Resolution: <br /> Spill Box # Spill Box# —Spill Box # Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑ bail ❑ Pass [ I fail ❑ Pass ❑ Fail <br /> ❑ Pass []Fail <br /> Comments—(include information on repairs made prior to testi# , and recommendedollow-u or ailed tests) <br /> Spill Buckets Tested annually,with Monitoring System Certification. <br />