My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:04:57 PM
Creation date
11/2/2018 8:31:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
9/14/2017 6:56:06 PM
QuestysRecordID
3636962
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V4 <br /> F. In-Tank Gauging I SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed it in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> U7esEl No` Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> No` Were all tank gaugingprobes visually inspected for damage and residue buildup? <br /> No` Was accuracy of system product leve!readings tested? <br /> No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No` Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> `In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® YesAEIN/A <br /> For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (CheItest? <br /> NIASimulated leak rate: ®3 g.p.h.: ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ® YesWere all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® YesWas the testing apparatus properly calibrated? <br /> ® YesFor mechanical LLDS,does the LLD restrict product flow if it detects a leak? <br /> C:] <br /> ❑ Yes ❑ No, For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® NIA <br /> ❑ Yes ❑ No` For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or discon <br /> ® N/A <br /> ❑ Yes ❑ No` For electronic LLDs,does the turbine automatically shut off€f any portion of the monitoring system malfunctions or rails <br /> � NIA <br /> ❑ Yes ❑ No" For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments; <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.