Laserfiche WebLink
0 <br /> SWRCS, MAY 2002 Page L of <br /> 6. PIPING S W TESTING <br /> 111 Method Developed by: C) Sump Manufacturer ❑ Industry Standard Professional Engineer <br /> 0 Other(5peclfy) <br /> Test Method C3 Pressnto [] Vacuum Hydrostatic <br /> Q Other(Spedfy) <br /> Tbst Equipment Used: VMI Equipment Resolution: .05 gph <br /> Sump# SUMP# .t$G 7-rc Same# Sump# <br /> Sump Diamulei G/,S <br /> Sump Depth <br /> Sump Material: f <br /> Height from Tank 7bp to Up of <br /> Highest Piping Penetration-- <br /> Height <br /> enetration.Height from Tank Top to Lowest <br /> Electrical-penetration: f <br /> Condition of sump prior to testing. <br /> Portion of Sump Tested: <br /> Does turbine shut down when sump <br /> sensor detects either product or water? <br /> Turbine shutdown response time: sSCC <br /> C <br /> Is system prograrnmcd for <br /> fail-safe shutdown? � <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time between applying pressure/ <br /> vacuuu&ater&starting test: --- `r <br /> Tbst Stan 77Fne: / <br /> Initial Reading <br /> Test Enda Time: <br /> Final Reading(RF): M j O <br /> Test Duration: <br /> Change in heading(W-Rj): Ut. 6yy/ <br /> Pass I Fail Threshold or Criteria: i nS Of <br /> 1'E.ST RESULT: PASS FAIL ET PASS FAIL []PASS ❑ PAIL PASS [] FAIL <br /> Was sensor removed for testing? Yes❑No 0 NA Yes C]No C]NA ❑Yes Q No[]NA []Yes C3 No 0 NA <br /> Was sensor properly replaced& <br /> verified functional after testing? M Yes Q No[]NA { Yes[]No Q NA ❑Yes[3 No C1 NA C Yes C)No 0 NA <br /> Comments—(Include information on repairs mads prior to resting,and recommended follow-up for failed tests) <br /> in <br /> g •d OTL,i7-EB6 (60a) 1:Dr SONadS SU d <br /> 00 = i0 00 LO aa0 <br />