Laserfiche WebLink
• <br /> SftCH,January 2002 Page of� <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By. U Sump mam&cturer U IndusBy Sfaadard Pro Sdotiel Bligineer <br /> U Other( e ) <br /> Test Method Used: U Pressuso U Vaauum )LeHydrosratlo. <br /> U Otherfy) <br /> Test Equipment Used: Ca l Lw ell Le ..t Lltiw �w.d( c� Gor BquipmeatRMIUtion: , o oS <br /> Sump#S sump# Sump Sump# <br /> Sump DEametcr. 4 Z'( 35't 5' uu r¢ 3 5- (Jr u u rE. 3 a 5 cca i2 <br /> Sump 3 6 1 n all <br /> Sump <br /> Material: <br /> Ilnight from Tank Top to Top of <br /> Hi st ' in Penetration: 2N i(1 1'7 11 U el <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: - 7iZ'� (��� ZY( ' 2311 <br /> Condition of sump prior to te§&$: 1)Y K V p✓ b Y <br /> Portion of Sump Tested( Wt -ei, vi k 4 ,rl.e..vtt 20y tA)q -u L.c� 26 till <br /> Does turbine shut down when <br /> sump sensor detects liquid(both es UM UNA es UNo UNA Vtes UNo UNA es. UNo UNA <br /> roduct and water? <br /> Turbine shutdown response time 7 <br /> Is system programmed for fat?-safe ex U No U NA <br /> shutdown?' _ es UNo UNA es UNo UNA, es UNo UNA <br /> Was i81i safe verified to be es U No LI NA <br /> 0 7' >65 UNo UNA ,) m UNo .UNA Yes UNo UNA <br /> Wait time between g <br /> pressure/vacu ater d starting <br /> teat: (d —Z45 to .mss . LO Wt"V"d-S tAYLII� �t �S <br /> Test Start Time; <br /> ! S U <br /> Initial Reading(Rq)! Fr✓s I rtr��. rust fi-rvSfGrwt2 Fr✓yi Crr <br /> Test End Time: <br /> Final Reading(ltr): VS <br /> Test <br /> FfvS� v3-FGrvc-(2 <br /> Test Duration: 30 IM11 rwutd 5 3DImixw)3 3OYYl x«.e s<5 3Ohrd <br /> Change in Reading(RF-Rj): N r7 N O Gi�ac.- N U nr� <br /> PRSSIFatl Threshold or Criteria: , 0o5�3owu... 005 0 � , OaS- loam> .00 Os.1w- <br /> Was sdnsot removed for testing? Yes U No UNA es U No U NA es U No U XA es UNo UNA <br /> Was sensor property replaced and Yes U No U NA <br /> Verified functional aflartestin 7 as UNo UNA J Yes UNo UNA AA Yes UNo UNA <br /> Comments-(Include Wor=don on repairs made prior io resrtr and r=mmmde.dfollow-up forLailed taws) _ <br /> ( If the em be depth of tha sump is not tested,specify how much was tested. If the answer to MY of the questions indicated with an <br /> asterisk(*)is"N(Y or"NA",the entire Gump must be tested. (See MCB LO-I60) <br />