Laserfiche WebLink
D. Results of Testing/Servicin. • ` <br /> Software Version Installed: / 7 .d <br /> Complete the following checklist: <br /> IFCJ Yes ❑ No* Is the audible alarm operational? <br /> EI-Yes ❑ No* Is the visual alarm operational? <br /> Y,ps ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned Ither equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communicationsent (e.g. modem) <br /> ❑�A operational? <br /> ET Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the pipingndary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconne ed,,Tln sensors initiatepositive shut-down? (Check all that apply) GrSuump/Trench Sensors; ment Sensors.Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑No.❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfing device (i.e. no0-91/A mechanical overfill prevention valve is installed), is the overfill warning alarm visiaudible at the tank_ fill point(s)and operating properly? If so,at what percent of tank capacity does the agger? <br /> ❑ Yes* Ef No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> _ and list the manufacturer name and model for all replacement parts in Section E, below. <br /> ❑ Yes* El No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that appl)) <br /> ❑Product; ❑Water. If yes, describe causes.in Section E,below. <br /> ❑ Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ❑ Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br />