My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO 1999-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:34 AM
Creation date
11/2/2018 8:37:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2007
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 1999-2007.PDF
QuestysFileName
COMPLIANCE INFO 1999-2007
QuestysRecordDate
9/14/2017 7:34:03 PM
QuestysRecordID
3637281
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J—OAdW@ COUNTY ENVIRONMENTAL HEALTiWPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE I (One form per facility) <br /> ROI. <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> ` 'I. FACILITYIINFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> R02. <br /> FACILITYNAMEIT5 <br /> R03. OITY ( � W <br /> FACILITY SITE DDRESS C. <br /> IL SPILL CONTROL AND CLEAN <br /> UP.METHODS <br /> This plan addresses unauthorized releases from US'f systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. safe! <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary, y remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be store in a properly labeled and sealed container. <br /> Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> D We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compat3le with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up bazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> - III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and atter each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> E UIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: Com let,onl if a lieable <br /> LOCATION AVAILABILITY <br /> EQUIPMENT azo MO. <br /> RIO. <br /> RI1. R21. RSI. <br /> R12. M1 R32, <br /> R13, <br /> 11,23, R3J. <br /> Rla, <br /> R2<, R34. <br /> RIS. R25 R35. <br /> IV. RESPONSIBLE PERSONS' <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> Ra. TI-IT.E (J Mo.NA E .C"tC ` �!.[ <br /> SO Q <br /> NAME Ral. TITLE R51. <br /> r 03 <br /> u <br /> -aa2 TIT <br /> NA �'E (�R52. <br /> ME—. -� T1�34 d ! QF 71SS I� <br /> R43. TITLE Rs]. <br /> NAME <br /> V. INDIRECT HAZARD DETERMINATION <br /> This information is required only when the presence of the hazardous substance can not be determined directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> Mo. <br /> 06!25/03 <br /> SJCEHD-e(06/03)-1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.