Laserfiche WebLink
D. Results of Testing/Servicin* <br /> Software Version Installed; 1 0 <br /> Complete the following checklist: <br /> es Cl No* Is the audible alarm operational? <br /> es ❑ No* Is the visual alarm operational? <br /> es ❑ No* Were all sensors visually inspected,functionallytested,and confirmed operational? <br /> _ Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> Yes ❑ * If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> NIA operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ NIA monitoring system detects a leak, fails to operate or is electrically disconnected? If yes; which sensors initiate <br /> positive shut-down? (Check all that apply) SumplTrench Sensors;, ispenser Co ainment Sensors. <br /> Did you confirm positive shut-down_ due to leaks and sensor failureldisconnection? es; ❑No. <br /> ❑ Yes ❑ o* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> NIA mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? If so,at what percent of tank capacity does the alarm tri ger? % <br /> Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* Ef No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> �Ces ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment oerational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page:2 of 3 03101 <br />