Laserfiche WebLink
SAN JOAQUIN COUNTY DATE cl <br /> &NVIRONMENTAL HEALTH DEPAR ,ENT PR#PR# <br /> 304 E. Weber Ave.,Third Floor, Stockton, CA 95202 PAG E <br /> (209)468-3420 <br /> UNDERGROUND STORAGE TANK(UST) PROGRAM INSPECTION REPORT <br /> Arvi A' f� <br /> Facility Name 6. SPA oagl-- Facility Address wA- <br /> Facilty Contact -�i Title 40 ak*A �UPPLr' Phone # ' ' Z <br /> UST# Products UST#Product ¢ ��BUST# Product u� UST# Product <br /> Overfill Prevention: ❑AudibleNisual .Mechanical Monitoring Panel: <br /> Piping System: ❑ Gravity ,61pressure Q Suction Violations: "Minor © Major <br /> Automatic Pump Shut Down Satisfies CCR 2636 g): Yes ❑ No Dispenser Pan: kYes © No <br /> INSPECTION TYPE: AiRoutine trlonitoring Certification ❑Complaint ❑Install ❑Removal ❑Repair/Upgrade <br /> COMPANY NAME: t9rb TECHNICIAN NAME: f6k2_, }4'V'140 PHONE: — p/oZ <br /> VIOLATION(S) <br /> The above facility is not in compliance with the following section(s) of Health & Safety Code (HSC) and/or <br /> California Code of Regulations (CCR): <br /> 1 HSC 25284 Permit to operate 20 CCR 2712 (b) Maintenance & monitoring <br /> 2 CCR 2637 Secondary cant testing (6 records <br /> month136 month) 21 CCR 2636 (f)(4) Annual line tightness test <br /> 3 /CCR 2711(b) & (c) Current State Forms A& B 22 CCR 2630 (d) Annual line leak detector test <br /> 4 `HSC 25292.2 Certification of financial 23 CCR 2630 (d) Annual monitoring certification <br /> responsibility and letter from 24 CCR 2643 (d) Daily monitoring of suction <br /> chief financial officer piping that is not continuously <br /> 5 CCR 2630 (d) Continuous monitoring system monitored <br /> for UST system 25 CCR 2636 (a) Conventional suction piping <br /> 6 CCR 2636 (c)(1) All releases in secondary piping shall have continuous <br /> flow to a collection sump monitoring & 21' containment <br /> 7 HSC 25291 (e) Water in secondary (20) cont 26 CCR 2643 (e) Biennial tightness test of gravi. <br /> 8 HSC 25291 (f) Automatic fine leak detector(s) piping that is not continuously <br /> 9 CCR 2636 (f)(1) Continuous monitoring system monitored <br /> for underground piping 27 CCR 2662 Upgrade requirements for US-i <br /> 10 CCR 2632 (c)(2) Continuous monitoring system system <br /> for UST 28 CCR 2661 Permit to repair UST system <br /> 11 HSC 25291(a)(2) Secondary containment for 29 HSC 25286 (a) Permit to alter monitoring <br /> UST is tight system <br /> 12 CCR 2636 (f)(1) Continuous monitoring system 30 HSC 25298 (a) Illegal abandonment of UST <br /> for dispenser system system <br /> 13 CCR 2635 (b)(1) Spill container 31 HSC 25298 (b) Permit to temporarily close U4 <br /> 14 CCR 2635 (b)(2) Overfill prevention system system <br /> 15 CCR 2631 (a) Primary containment is product- 32 HSC 25298 (c) Permit to close UST system <br /> tight 33 HSC 25291 (e) Water in 211 cont analyzed and <br /> 16 HSG 25292.1 UST system is operated to properly disposed of <br /> prevent unauthorized release 34 CCR 2640 (e) Single wall component within <br /> 17 CCR 2650 Recording/reporting 1 000'of Public Well, no ELD <br /> unauthorized release 35 CCR 2635(a)(2)(A)Cathodic protection testing <br /> 18 CCR 2632 (d) Monitoring & response plan 36—/H&SC 25299(a)(9)Disabling leak detect. devices <br /> 19 CCR 2712 (i) Monitoring & response plan is 37 ✓ Violation(s) not listed above <br /> on site <br /> EHD INSPECTOR: Uff,I JI-`L/L-' PHONE: <br /> RECEIVED BY: 7 TITLE: S <br /> UNMIGUSTIINSP(rev 7/24102) <br />