Laserfiche WebLink
Page Z <br /> SWRCB, MAY 2002 <br /> 6, PIPING SNM[ TESTING Professional Engineer <br /> Sum industry Standard <br /> Test Method Developed by: p Manufacturer 13 <br /> other(specify) C) Hydrostatic <br /> Test Method <br /> . � Pressure C3 Vacuum <br /> Other(specify) <br /> Equipment Resolution: -05 gph <br /> "fest Equipment Used: VMI <br /> Z-W---�t Snmp# :,j <br /> mg# <br /> Sump# $umP# <br /> ��!S <br /> Sump Diameter <br /> Sump Depth <br /> t <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest ` t <br /> Electrical-Penetration: f i <br /> Condition of sump prior to testing. <br /> Portion of Sump Tested: <br /> Does turbine shut dawn when sump <br /> sensor detects either product or water? <br /> Turbine shutdown response time: <br /> Is system programmed for <br /> fail-safe shutdown? <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time between applying pressure/ <br /> vamurnlwater&starting test: <br /> Test Start Time: <br /> ------------- <br /> Initial Reading(R:) <br /> .fr / <br /> Test End Timc: d f ®� <br /> Final Reading(R,,): <br /> Test Duration: <br /> D prt, <br /> Change in Reading <br /> Pass/Fail Threshold or Criteria: i C,-< Clf PASS Q FAIL <br /> PASS � 3E'AIL PASS [3 FAIL [�FASS [) FAIL Q <br /> TEST RESULT: Yes 0 No 13 NA ❑Yes 13 No NA <br /> Was sensor removed far testing? Y� No Q NA Yes No NA <br /> �NA Yes �No[ NA <br /> Was sensor propsrl replaced& Yes No NA (rYeNo(3NAYes No � <br /> verified functional after testing? <br /> and recaramended follow-up for failed tests) <br /> CoMments—(include inforvw&n on repairs made prior to testing,l <br />