My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4807
>
2300 - Underground Storage Tank Program
>
PR0231510
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:09:15 PM
Creation date
11/2/2018 9:01:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231510
PE
2381
FACILITY_ID
FA0003513
FACILITY_NAME
REVCHEM COMPOSITES
STREET_NUMBER
4807
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17746019
CURRENT_STATUS
02
SITE_LOCATION
4807 S AIRPORT WAY # D
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4807\PR0231510\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/6/2011 8:00:00 AM
QuestysRecordID
96698
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEOFCAUFORMA ,,9,.,,,�., s <br /> STATE WATER RESOURCES CONTROL BOARD ' <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �X>° <br /> C/ <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM c"��°���� <br /> MARK ONLY ❑ I NEW PERMIT ❑ 3 RENEWAL PERMIT 21,15 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 9 TEMPORARY TANK CLOSURE ❑ S TANK REMOVED Q <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: VkO7 Al ` o'* <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A, OWNERS TANK 1.D.0 B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MODAYNEAR) 0. TANK CAPACITY IN GALLONS: O O O <br /> II.TANKC ENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> A <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ la REGULAR <br /> 3 DIESEL a AVIATION GAS <br /> 2 PETROLEUM ❑ BO EMPTY 1 PRODUCT ❑ Ib PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> UNLEADED 5 JET FUEL <br /> 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED 99 OTHER (DESCRIBE IN ITEM 0. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.X: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C,AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ DOUBLE WALL f73 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM V2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ B POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 9 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED XYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR F-15 GLASS LINING S UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> 1S LINING MATERIAL COMPATIBLE WITH IOD% METHANOL? YES— NO_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2,00ATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTIONrilloll NONE 95 UNKNOWN 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U SUCTO A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION AINGLE W A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A 1 BARE ST L A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U a CONCRETE A U 7 STEEL W/COATING A U 9 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHOOICPROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING NOTNRORING ❑ 9a OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 V MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 5 TANK TESTING ❑ 7 INTERSTITIAL MONITORING 1 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAYYR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL7 YES ❑ NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME GATE <br /> IPRINTE9 a SWNATUREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY a JURISDICTION x FACILITY x TANK• //E.pQrvg' <br /> STATE I.D.# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERM IT EXPIRATION DAT <br /> FORMS (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT-FORM A HAS BEEN FILED, l� <br /> FOROD116A6 <br /> `k �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.