Laserfiche WebLink
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION-FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. " <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT %;Z 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ITE <br /> ONE TEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED O <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED:S -�, <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) U� D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B, C 19 REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATIONGAS <br /> 2 PETROLEUM ❑ SO EMPTY 1 PRODUCT ❑ 1E PREMIUM UNLEADED E] 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN �2 WASTE ❑ 1C MIDGRADE UNLEADED ❑ 5 JETFUEL ❑ 8 M95 <br /> ❑ 2 LEADED IQ 99 OTHER(DESCRIBE M ITEM D.BELOW) <br /> D. IF(KI)IS NOT MARKED, ENTER NAME OFSUBSTANCE STORED u�r. C.A.S.#: <br /> Ill. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A B.AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 15iv <br /> 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL O 2 STAINLESS STEEL O 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PHm"Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 5 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY UNING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP 2 COATING 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 9/ NONE UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,BtC. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO STRIKER PLATE YES NO DISPENSERCONTAMMENT YES_ NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPUCABLE <br /> A. SYSTEM TYPE Ak 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION AfD SINGLE WALL A U Z DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STF.E�W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A S UNKNOWN A U 99 OTHER <br /> 1 MECIM 1 UNE IUNE 1IG111NE53 COHRVI=INiEBSi k 4 ELCObNIC UNE <br /> 5 AVfOW11C WM' <br /> D. LEAK DETECTION ❑ 9LTE0roR ❑2 TESTNO ❑3 uoNTaRNa EtEAX 9ETE0TOB ❑ 9xn00xT1 ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 pRECO CILIATIONORY E]UAL 3 MO ITZE ORING ❑ 4 GAUGING <br /> TANK ❑5 MON TORINGTER r78 TESTINANNUALGTANK <br /> ❑ 7 <br /> MONITORING INTERSTITIAL ❑ 8 SIR ❑ 9 AryEK GAUGING ❑10 TESTNGV TANK ❑ 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PUCE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ C❑ <br /> SUBSTAGE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED A SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK* <br /> STATE LEI.# p p (o <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE / <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORMA HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT P' FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THF �RGROUND STORAGE TANK REGULATIONS <br /> FORM B (6.95) �%/ \� <br />