Laserfiche WebLink
RAH <br /> ENVIRONMENTAL, INC. <br /> SITE SPECIFIC HEALTH AND SAFETY PLAN <br /> UNDERGROUND STORAGE TANK REMOVAL <br /> STOCKTON AIRPORT,STOCKTON,CA <br /> RAH PROJECT NO. 1252 <br /> This plan must be completed prior to the initiation of tank removal operations. All <br /> personnel associated with this project must be certified according to CFR 1910.120 (e) <br /> requirements related to hazardous materials safety. All personnel performing field work <br /> for this project are to read this plan prior to the start of field work. A copy of this plan <br /> will be accessible to all personnel during the field operations. The individual responsible <br /> for site safety is Mr. Michael Williams, Engineering Manager for RAIZ Environmental, <br /> Inc. <br /> 1. Project Name <br /> Stockton Airport - UST Removal <br /> 2. Project Location <br /> 5000 S. Airport Way <br /> Stockton, CA 95206 <br /> 3. Site Description <br /> The project site is located at the corner of Lockheed Court and CE Dixon Street <br /> inside the Stockton Airport (see attached site plan). The tanks are located behind <br /> a chain link fence and the area around the tanks is unpaved. <br /> 4. Project Personnel <br /> Project Manager: Mike Williams <br /> Project Supervisor: Louis Pelletier <br /> Equip. Operator: Dennis Rich <br /> Env. Tech: Harry Hurd <br /> Class A License#592216 Fed I.D. #68-0219341 <br /> 3310 Swetzer Road. Loomis,CA 95650 <br /> FAX(916)652-8955 Office (916)652-5777 <br />