Laserfiche WebLink
SWRCB, January 2002 to <br />i <br />6. PH"ING SUMP TESTING <br />Test Method Qeveloped By: ❑ Sump Manufacturer U Industry Standard <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure <br />❑ Vacuum <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Svstem., <br />Page of <br />X Professional Engineer <br />X Hydrostatic <br />Equipment Resolution: .005/30 min <br />Sump Diameter: <br /># 1 # <br />Sump Sump# Sump # Sump # <br />pressure/vacuum/water and starting <br />48" <br />Sump Depth: <br />4$„ <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />.001, <br />Hi hest Pi in Penetration: <br />28" <br />Height from Tank Top to Lowest <br />0 <br />Electrical Penetration: <br />24„ <br />Condition of sump prior to testing: <br />Dry <br />Portion of Sump Tested' <br />2" above Highest piping <br />Does turbine shut down when <br />penetration <br />s <br />urrrp sensor detects liquid (both x Yes ❑ No ❑ NA ❑ Yes Q No ❑ NA ❑ Yes U No ❑ NA ❑Yes 11 No ❑ NA <br />,product and water)?` <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?` x Yes ❑ No ❑ NA ❑ Yes ❑ No Ll NA 0 Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />op erational?` E Yes x No DNA ❑ Yes []No ENA I7 Yes I J No i_jNA ❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />5 min <br />test: <br />Test Start Time: <br />$:45 <br />Initial Reading (1�): <br />.001, <br />Test End Time: <br />9:15 <br />Final Reading (RF): <br />0 <br />Test Duration: <br />30 min <br />Change in Reading (RF -Rt): <br />Pass/Fail Threshold or Criteria: .005/30 min <br />Test Result: x Pass ❑ Fail <br />Was sensor removed for testing? x Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testinl-? x Yes No ❑ NA <br />5 min <br />30 min <br />.005/30 min <br />❑ Pass ❑ Fail <br />x Yes ENO ❑ NA <br />x Yes ❑ No ❑ NA <br />5 min <br />5 min <br />001, f .00" �I <br />30 rain <br />.005/30 min <br />q Pass ❑ Fail <br />x Yes ❑ No ❑ NA <br />x Yes L 1 No ❑ NA <br />30 rrfin <br />_005/30 min <br />❑ Pass 0 Fail <br />❑ Yes ❑ No U NA <br />D Yes ❑ No ❑ NA <br />Comments --- (include inf vrmation on repairs made prior to testing and recommended follow-up for failed tests) <br />SIx moth retest [diteY Ye GAYS to pt]2�lYlg penetraion <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk M is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />