Laserfiche WebLink
1 � <br />F. In -Tank Gauging I SIREquipment: <br />g 9Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />® Yes <br />❑ <br />No" <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ <br />No" <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />® Yes <br />❑ <br />No" <br />Was accuracy of system water level readings tested? <br />® Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />® Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />III -kivll ", NcIVw, uv0wiuC ❑VW anu wiled ulebe VBrlclerlclBS were or will oe correcsea. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Comnlofa fho fnllnwinn rhwrldiaf• <br />❑ <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ <br />N/A <br />Simulated leak rate: 0 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g. p. h. <br />0 <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ <br />No" <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product Flow if it detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® <br />NIA <br />❑ <br />Yes <br />❑ <br />No, <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />NIA <br />® <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />III JCI:LWII A, ueruw, 4eticrWe IIIJw dlla WI1BfY IfleSe aerlclanGlBS WBF@ or win aorreClea. <br />H. Comments: <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />