My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 3:30:17 PM
Creation date
11/2/2018 9:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
1/23/2018 6:18:21 PM
QuestysRecordID
3769490
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Check this box if no taning or SIR equipment is installed. <br />This section must be completed if in -tank gauging equlpment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />In Section H, below, describe In <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were ail tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readings tested? <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />and when these deficiencies were or will ba corrected. <br />Check this box if LLDs are not installed. <br />checklist: <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; ❑ 4.1 g.p.h ; ❑ 0.2 g.p.h. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />and when these deficiencies were or will be eorrectPri <br />H. Comments; <br />DSL 130 3 28 14 PASS <br />0 � 2014 <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />followi <br />* <br />❑ No* <br />NfA❑ <br />* <br />FCome <br />No' <br />No* <br />tYe <br />N!A <br />No* <br />NIA <br />No* <br />In Section H, below, describe I <br />Jne Leak Detectors (LLD): <br />N/A <br />In Section H, below, describe In <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were ail tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readings tested? <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />and when these deficiencies were or will ba corrected. <br />Check this box if LLDs are not installed. <br />checklist: <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; ❑ 4.1 g.p.h ; ❑ 0.2 g.p.h. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />and when these deficiencies were or will be eorrectPri <br />H. Comments; <br />DSL 130 3 28 14 PASS <br />0 � 2014 <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />followi <br />❑ No* <br />NfA❑ <br />FCome <br />No' <br />No* <br />No* <br />N!A <br />No* <br />NIA <br />No* <br />N/A <br />No* <br />NIA <br />No* <br />N/A <br />No* <br />In Section H, below, describe In <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were ail tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readings tested? <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled properly? <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />and when these deficiencies were or will ba corrected. <br />Check this box if LLDs are not installed. <br />checklist: <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; ❑ 4.1 g.p.h ; ❑ 0.2 g.p.h. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />and when these deficiencies were or will be eorrectPri <br />H. Comments; <br />DSL 130 3 28 14 PASS <br />0 � 2014 <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.