My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 3:30:17 PM
Creation date
11/2/2018 9:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
1/23/2018 6:18:21 PM
QuestysRecordID
3769490
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' if the entire depth of the sump is not tested, specify how much was tested. If the answer to gny of the questions indicated with an <br />asterisk (*) is "NO" or "ATA", the entire sump must be tested. (See SWRCB LG -160) <br />SWRCB, January 2002 <br />Page <br />of <br />6. PIPMG SUMP TESTING <br />Test Method Developed By: <br />❑ Sump Manufacturer ❑ Industry Standard <br />X Professional Engineer <br />❑ father (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell Systems <br />Equipment <br />Resolution: .005/30 min <br />Sump # t <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />48" <br />Sump Depth: <br />43 %" <br />Sump Material: <br />Fiberglass <br />Height from Tank Top to Top of <br />Hi hest Pi in Penetration: <br />27„ <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />201" <br />Condition of sump prior to testing: <br />Dry <br />Portion of Sump Tested' <br />2" above <br />Highest piping <br />penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />x Yes D No ❑ NA <br />LI Yes ❑ No ❑ NA <br />❑ Yes ❑ No <br />❑ NA ❑ Yes ❑ No <br />EI NA <br />product and water)?` <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />- <br />shutdown?' <br />x Y es ❑ N o ❑ NA <br />❑ Yes C] No ❑ NA <br />❑ Yes ❑ No <br />❑ NA Q Yes ❑ No <br />❑ NA <br />Was fail-safe verified to be <br />o erational?• <br />❑ Yes x No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes 0 No <br />0 NA ❑ Yes ❑ No <br />❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />5 min <br />5 min <br />5 rain <br />5 min <br />test: <br />Test Start Time: <br />9:16 <br />Initial Reading (RJ: <br />OQ" <br />.00" <br />.00" <br />.001, <br />Test End Time: <br />10:16 <br />Final Reading (RF): <br />.00 <br />Test Duration: <br />l Hour <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF -R,): <br />.00 <br />Pass/Fail Threshold or Criteria: <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />Test Result: <br />x Pass 0 Fait <br />11 Pass []Fall <br />❑ Pass ❑ Fail D Pass ❑ Fail <br />Was sensor removed for testing? <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No 0 NA <br />x yes ❑ No <br />❑ NA ❑ Yes 3 No <br />❑ NA <br />Was sensor properly replaced and <br />verified functional after, testing? <br />x Yes ❑ No ❑ NA <br />x Yes [j'No ❑ NA <br />x Yes ❑ No <br />0 NA D Yes ❑ No <br />❑ NA <br />CbmmentS — (include information on repairs made prior to testing, and recommendedfollow-up forfailed tests) <br />' if the entire depth of the sump is not tested, specify how much was tested. If the answer to gny of the questions indicated with an <br />asterisk (*) is "NO" or "ATA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.