My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 3:30:17 PM
Creation date
11/2/2018 9:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2013 - 2016.PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2016
QuestysRecordDate
1/23/2018 6:18:21 PM
QuestysRecordID
3769490
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Petroleum Service <br />0 <br />.916-372-4873 <br />P-2 <br />• <br />UST SYSTEM RETROFIT OR REVE <br />(Submit minimum of 3 sets of plans & a l- PAIR <br />Site map enclvsed9 <br />Pi, catlons as originals will be retained by EHD) JA ;N � <br />1- <br />YES � ] No Pi, <br />2 2014 <br />2• Submit Capias of ICC Service Technician and/or Installer's Certificate and all�� <br />Person installing <br />or testing any component that is repaired or repia�d Ensure Ccfurer trainin cHEA Ly <br />Plan" is available on tihejobsite as required by Title e 9 � <br />3. Detailed description of work to be com feted, oPY of the "Site Heaith and a,e <br />to scale showing location of repairs and/vr replacements. ]f repairing a component <br />p List components ao be repaired or component, <br />de replaced r and attach a diagrambedo drawn <br />d n piping. UC3t✓'s, or other U51 equipment, or performing tank to u <br />Pages 4-8 as necessary for a timely describe how this +rrili be dpfTe- (1 f <br />Y plan review): P upgrade, use the UST Installation Application <br />-11 <br />MA <br />e <br />rr <br />4. List of ec-iprrent to be user ;A.t;ach manufacturer's s <br />(_ pacification sheets shaving third -party approval): <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.