Laserfiche WebLink
i 0 <br />GEMER-Rwif INc. <br />6 GR Job # <br />F. In -Tank Gauging 1 SIR Equipment: [K Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform teak detection mi r ' V E L",; <br />Complete the following checklist: <br />U"'U <br />"'vHas <br />all input wiring been inspected for proper entry and termination, including testing for <br />p Yes ❑ <br />No ' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ <br />No` <br />I Was accuracy of system products level readings tested? <br />Q Yes [� <br />No' <br />Was accuracy of system water level readings tested7 <br />❑ Yes ❑ <br />No' <br />Were all probes reinstalled properly? <br />[] Yes ❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, <br />below, <br />describe how and when these deficiencies wgrg or will be corrected. <br />G. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />complete the following checklist: <br />❑ <br />es❑ <br />rqilpmen start -up -or annus equipment ce r ca eon, was a ea simu a o ven peo o <br />eapupy)Simulated <br />NA <br />leak rate: ❑ 3gii [1 0,1 g.p.h. [1 0.2 g.p,h <br />❑ <br />Yes <br />❑ <br />No' <br />I Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ <br />No' <br />lWas the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />No' <br />For Mechanical LL Ds, does the LLD restrict product flow if it detects a leak? <br />❑ <br />NIA <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />NIA <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ <br />NIA <br />Disconnected? <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />Q <br />NIA <br />fails a test? <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />NIA <br />all items on the equipment manufacturer's maintenance checklist completed? <br />ibe how and w en these deficiencies were or will be corrected <br />G. Comments: <br />Did not test PLLD <br />Iden, rQ nC74 <br />or <br />is'or <br />Monitoring System Certification Page 3 of 4 12107 <br />3 <br />Ai <br />IT <br />