Laserfiche WebLink
In Section H, below, describe how and when these deficiencies were or will be corrected <br />H. Comments: <br />Monitoring System Certification Page 3 of 4 2/21107 <br />C. <br />F. <br />In -Tank Gauging <br />I SIR Equipment: ® Check this box if tank gauging is used only for inventory control, <br />[] Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed <br />if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete <br />the following checklist: <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />[PH <br />Was accuracy of system product level readings tested? <br />Was accuracy of system water level readings tested? <br />ENIVIDApi <br />Were all probes reinstalled properly?la�q,rr <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />" In Section H, below, describe how and when these deficiencies were or will be corrected. <br />Line Leak <br />Detectors <br />(LLD): <br />❑ Check this box if LLDs are not installed. <br />Cum Tete the followin <br />checklist: <br />® <br />Yes <br />LJ <br />❑ <br />No" <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate; ® 3 g. p. h.; ❑ d.t g.p.h ; ❑ u.2 g.p h. <br />® <br />Yes <br />❑ <br />No' <br />Were all Li confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />® <br />Yes <br />❑ <br />No' <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® <br />N/A <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />0 <br />NIA <br />❑ <br />Yes <br />® <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />0 <br />NIA <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencies were or will be corrected <br />H. Comments: <br />Monitoring System Certification Page 3 of 4 2/21107 <br />C. <br />