Laserfiche WebLink
In Section H, below, describe how and when these deficiencies were or will be corrected. <br />Line Leak Detectors (Ii ❑ Check this box if LLDs are not installed <br />❑ <br />F. <br />In -Tank Gauging !SIR Equipment: El Check this box if tank gauging is used only for ro <br />El Check this box if no tank gauging or SIR equipmveen <br />FECEIVED <br />No' <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />❑ <br />Complete <br />the following checklist: <br />® <br />Yes <br />❑ <br />No" <br />015 <br />® <br />Yes <br />❑ No' Has ail input wiring been inspected for proper entry and termination, including testing for ground faults? <br />No` <br />® <br />Yes <br />❑ No` Were all tank gauging probes visually inspected for damage and residue buildup?EENVIRONN'NTAL <br />❑ <br />® <br />Yes <br />❑ No' Was accuracy of system product level readings tested? <br />$ACIUT <br />® <br />Yes <br />❑ No` Was accuracy of system water level readings tested? <br />❑ <br />❑ <br />Yes <br />❑ No' Were all probes reinstalled properly? <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />0 <br />Yes <br />❑ No` Were all items on the equipment manufacturer's maintenance checklist completed? <br />N/A <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />Line Leak Detectors (Ii ❑ Check this box if LLDs are not installed <br />❑ <br />Yes <br />❑ <br />No' <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ <br />NIA <br />Simulated leak rate: E 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0,2 g,p.h. <br />® <br />Yes <br />❑ <br />No" <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ <br />No` <br />Was the testing apparatus properly calibrated? <br />Yes <br />❑ <br />No" <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />NIA <br />❑ <br />Yes <br />❑ <br />No` <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />N/A <br />❑ <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® <br />N/A <br />Cl <br />Yes <br />❑ <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® <br />NIA <br />® <br />Yes <br />❑ <br />No" <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />` In Section H, below, describe how and when these deficiencies were or will be correctea. <br />H. Comments: <br />Monitoring System Certification Page 3 of 4 2/21107 <br />