Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment: ® Check this box if tank gauging is used only for inventory central. <br /> ❑ Check this box If no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ® Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No' Was accuracy of system product level readings tested? <br /> ® Yes ❑ No' Was accuracy of system water level readings tested? <br /> ® Yes ❑ No' Were all probes reinstalled property? <br /> ® Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLD(: ❑ Check this box if LLDc are not installed. <br /> Complete the following checklist: <br /> ® <br /> Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ NIA Simulated leak rate'. ®3 g.p.h.; ❑0.1 g.p.h; [10.2 g.p.h. <br /> ® <br /> Yes ❑ No' Were all LLDs confirned operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No- For mechanical LLDs,does the LLD restrict product flow If it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off If the LLD detects a leak? <br /> ® WA <br /> ❑ Yes ❑ No' I For electronic LI-Ds,does the turbine automatically shut off 9 any portion of the monitoring system is disabled or disconnected? <br /> ® NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off'd any portion of the monitoring system malfunctions or fails a test? <br /> ® NIA <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible win ng connections been visually inspected? <br /> ® NIA <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />