Laserfiche WebLink
S W RCB. January 2002 <br /> Page 3 of 7 <br /> Job: Estes Trucking <br /> 7611 S. Airport Way <br /> Stockton,CA 95206 <br /> Date: 09/22/2010 <br /> 5. SECONDARY PIPE TESTING professional <br /> Test Method Developed By: [ ]Piping Manufacturer [X] Industry Standard [ ] <br /> Engineer <br /> [ ] Qther(Sped) <br /> [X]Pressure` [ ]Vacuum [ ]Hydrostatic <br /> Test Method Used: [ ] Other(Specify) <br /> Test Equipment Used: Pressure Gau e E ui ment Resolution: 0.20 <br /> Piping Run #1 Piping Run Piping Run Piping Run Piping Run <br /> Pi in' Material: Fiber lass <br /> Piping Manufacturer A. O. Smith <br /> ~Pi in Diameter: 3"and 2" <br /> Len th of Pi in Run: 12 ft. <br /> Product Stored; Diesel <br /> Method and location of 3 x 2 Boot <br /> i in -run isolation: <br /> Walt time between applying <br /> pressure/vacuum/watcr and 5—Minutes <br /> startin test <br /> Test Start Time: 10:00 A.M. <br /> Initial ReadinRI 3 P.S.I. <br /> Test End Time: 11:00 A. M. <br /> Final Reading(Rq: 5 P.5.1. <br /> Test Duration: I HOUR <br /> Chan a in Readin Rf-Rl -0- <br /> +Pass/Fail Threshold or -0- <br /> Criteria: <br /> Pass I I Pall I I Pass 1 1 Fall I I Pass 1 1 I I Pass I I Fail <br /> Test Resulr. (XI Pass[ 1 Fall [ 1 <br /> Fail <br /> i <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />