Laserfiche WebLink
F.` In-Tank Gauging/SIR Equip*eent: ( X )Check this box if tank 6.,.ging is used only for inventory control. <br /> ( ) Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in,tank gauging equipment is used to perform leak detection monitoring. <br /> Cam lete the following checklist: <br /> (x)Yes ❑ No; Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> (x)Yes O No* Were all tank gauging probes visually inspected for damage and residue buihdup7 <br /> (x)Yes ❑ No" Was accuracy of system product level readings tested? <br /> (x)Yes Nn" was accuracy of system water level readings tested) <br /> (x)Yes U No* Were all probes reinstalled properly? <br /> (x)Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * in the Section H,below,describe bow and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): O Check this box if LLDs are not installed. <br /> Com Ic the following checklist: - <br /> C Yes ❑ Nn" For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance'? <br /> 0 N/A (Cheek all that appal Simulated leak rate: ❑x 3 g.p-h.; Cl 0.1 g.p.h ; ❑0.2 g.p.h. <br /> 0 Yes ❑ No* Were all LLM confirmed operational and accurate within regulatory requirements? <br /> O Yes ❑ No" Was the testing apparatus properly calibrated? <br /> IM Yes ❑ No* For mechanical LLDs,does the LLD restrict product now if it detects a heak7 <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if fire LLDdetect a Ieak1 <br /> ® N/A <br /> ❑ Yes EJ No" For electronic LI,Ds, docs the turbine automatically shirt off if any portion of the monitoring system is disabled <br /> ❑O N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any potion of the monitoring system malfunctions <br /> © N/A or fails a test? <br /> ❑ Yes ❑ Not I'or electronic LL.Ds,have all accessible wiring connections been visually inspected? <br /> M N/A <br /> I@ Yes ❑ Nu* Were all items on the equipment manufacturer's maintenance checklist compleed? <br /> *In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> FI, Comments: --- . <br /> Mminnring System Certification Page 3 of 3 12/07 <br />