Laserfiche WebLink
((ll BACKFILL EXCAVATION CERTIFICATE <br /> Project Location <br /> Owner <br /> Phone No. <br /> Contractor Q l(/�f r — C y J�1� Phone No. �r� ;23�F7No.- <br /> INDICATE <br /> �� License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> ✓ 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in thezcavation in 12" lifts: <br /> A. Pea gravel—smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon [atilt <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> � ame nn[ <br /> �- <br /> /�ufj' t) <br /> signature <br /> ' Shall be the responsible managing employee on the license or authorized agent. <br />