My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALHAMBRA
>
8661
>
2300 - Underground Storage Tank Program
>
PR0540153
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2021 10:05:30 PM
Creation date
11/2/2018 9:26:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0540153
PE
2381
FACILITY_ID
FA0022961
FACILITY_NAME
GEORGE, ERNIE
STREET_NUMBER
8661
STREET_NAME
ALHAMBRA
STREET_TYPE
AVE
City
STOCKTON
Zip
95212
APN
08525046
CURRENT_STATUS
02
SITE_LOCATION
8661 ALHAMBRA AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALHAMBRA\8661\PR0540153\BILLING.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N ..r <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD .m� <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION -FORM B <br /> I <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ,❑,�7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT F-14 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE —f 18 TANK REMOVED I <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 9 1496 galid filkCL— DG + <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MC/DAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> ILTANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A DC 1 1 MOTOR VEHICLE FUEL F-14 OIL B. C. 1a REGULAR UNLEADED [—] 3 DIESEL ❑ 6 AVIATION GAS <br /> /❑— 2 PETROLEUM ❑ BO EMPTY 1 PRODUCT ❑ 1b PREMIUM UNLEADED E] 4 GASAHOL ❑ 7 METHANOL <br /> ❑ is MIDGRADE UNLEADED E::] 5 JET FUEL ❑ 8 MBS <br /> ❑ 3 CHEMICALPRODUCT EJ 95 UNKNOWN ❑ 2 WASTE 2 LEADED ❑ 99 OTHERICESCRIBEINITEMD.BELO'WI <br /> D. IF(A1)IS NOT MARKED, ENTER NAME OF SUBSTAGE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A B.AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR UNER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM F<2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK X <br /> 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary TMII) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER UNED F-12 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING J( 8 UNLINED ❑ 95 UNKNOWN ED 89 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NOX <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION <br /> NONE E:] 95 UNKNOWN [::199 OTHER <br /> E.SPILL AND OVERFILL,etc. DROP <br /> CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A& SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A. BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODICPROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION [D' KcK m ME Dale ❑2 ISE 3MK W!UI ❑3 carrt AWS IN1ERSi ❑4 ELECT NC Ura: E::]5 AU MA=PUMP 98 OTHER _/ <br /> �n <br /> OETECfCP TESTING NONigiulG LAK 9ETECTCR SNUI60KN <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 RECONCILIATIONUAL ORY ❑ 3 VADOZE MONITORING E] 4 AUTOMATIGAUGING MONITORING <br /> TANK ❑ 5 GROUND MONTORINGTER F-1 ANNUALTANK <br /> 6 TESTING <br /> ❑ T <br /> MONITORING INTERSTITIAL O 8 SIR ❑ 9 TANK GAUGINGAL ❑10 MOTESTINGHLY TANK 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIM D DATE LAST USED O/DAYA'R) 2.ESTIMATED QUANTITY OF ��1� 3.WAS TANK FILLED WITH YES ❑ G <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTW d SIGNATURE) 7✓ <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW -1. <br /> COUNTY# JURISDICTION# FACILITY# <br /> STATE I.D.# = E <br /> PERMIT NUMBER PERMIT APPROVED BY/OATE PERMIT EX <br /> MM*R VATE� 71 <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PLAN. FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORMS (6-95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.