My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALMONDWOOD
>
5151
>
2300 - Underground Storage Tank Program
>
PR0231424
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 10:26:30 PM
Creation date
11/2/2018 9:27:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231424
PE
2381
FACILITY_ID
FA0003791
FACILITY_NAME
TUFF BOY INC
STREET_NUMBER
5151
STREET_NAME
ALMONDWOOD
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22606017
CURRENT_STATUS
02
SITE_LOCATION
5151 ALMONDWOOD DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALMONDWOOD\5151\PR0231424\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/23/2011 8:00:00 AM
QuestysRecordID
99161
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA lq / � ., <br /> STATE WATER RESOURCES CONTROL PPL(BOARDmom, ' R <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B �;p ,� e� <br /> 1 <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION7 PERMANENTLY CLOSED N SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE B TANK REMOVED In <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: & 51- V <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# 8. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAYJYEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> '-19A, 1 MOTOR VENICE FUEL a 4 OIL C. 'Ej1e REGULAR UNLEADED O 3 DIESEL ❑ 6 AVIATIONGAS <br /> 2 PETROLEUM ❑ 80 EMPTY I PRODUCT ❑ 1b PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> ❑ lc MOGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELONG <br /> D. IF(AI)IS NOT MARKED. ENTER NAME OF SUBSTAGE STORED C.A S.#: <br /> IIL TANK CONNSST-RUCT10N MARK ONE ITEM ONLY IN BOXES A B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A TYPE OF I SYSTEM Iv 2 DOUBLE <br /> WALL ❑ 4 SINGE WALL W A VTH EXTERIOR LINER O 599INTER AL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> OTHER <br /> B. TANK ❑ I BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD N FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE O 6 POLYVINYL CHLORID7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE WIFRP <br /> (PNmYy TM1k) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN 99 OTHER <br /> C.INTERIOR ❑ I RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY UNING 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED t� 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 10D% METHANOL? ��\ IY��—ESIII— NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP E] ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION El 91 NONE 95 UNKNOWN O 99 OTHER <br /> SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> E SPILL AND OVERFILL,BIC. DROP TUBE YES_ NO_ STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPUCABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U i BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL N COATING A U B 100% METHANOL COMPATIBLENFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> 1 1ECNNa.LL LME LEAN U <br /> 4 TMK W C UG INTFJ151RLLL BECBIIX4C NE 5 AUIq =RAP <br /> D. LEAK DETECTION ❑ DETECTOR ❑2 UK TESRMI ❑3 MOMTgIMO ❑ LEM DETECTOR 9MDOvm ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 RMECOU CIUATIONOflY ❑ 3 MAONNIITORING ZE ❑ 4 GAUGWG AUTOMATIC: TANK ❑5 GROUND WATER <br /> ❑ 6 ANNUALTESTING <br /> ❑ 7 <br /> MONITORING INTERSTITIAL O 8 SIR ❑ 9 WEEKLYA MANGA ❑ 10 MOTESNTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ING <br /> VI,TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PUCE) <br /> 1.ESTIMATED DATE USED(MO/DAWYR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> -Z O! C� jt� SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRIMED d SIGNATURE( <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY M JURISDICTION# FACILITY# TANK M <br /> STATE I.D.# O rL3JVM <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> 5 <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLP'ATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT r FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING TH' TRGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.