My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
11291
>
2300 - Underground Storage Tank Program
>
PR0508323
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:37 AM
Creation date
11/2/2018 9:28:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0508323
PE
2381
FACILITY_ID
FA0008032
FACILITY_NAME
SAN TOMO PARTNERS
STREET_NUMBER
11291
Direction
N
STREET_NAME
ALPINE
STREET_TYPE
RD
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
11291 N ALPINE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALPINE\11291\PR0508323\REMOVAL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kCKFILL EXCAVATION CERTIFICATE <br /> Project Location San Tomo Partners, 11291 N. Alpine Rd. , Stockton CA 95212 <br /> Owner San Tomo Partners Phone No. (209)948-0792 <br /> Contractor Jim Thorpe Oil , Inc. Phone No. (209 )368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g. load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12 lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rockāself-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * Jim Thor e Oil e <br /> Name not <br /> * Cont for <br /> i e rm <br /> * <br /> tgnam e I L9 <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.