My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
11291
>
2300 - Underground Storage Tank Program
>
PR0508323
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:37 AM
Creation date
11/2/2018 9:28:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0508323
PE
2381
FACILITY_ID
FA0008032
FACILITY_NAME
SAN TOMO PARTNERS
STREET_NUMBER
11291
Direction
N
STREET_NAME
ALPINE
STREET_TYPE
RD
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
11291 N ALPINE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALPINE\11291\PR0508323\REMOVAL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t1r�a � <br /> S. a Defy rlee can ffiodw4a��benpuergect -by�inseer�til�g sdry ice (CO2 ) at the rate <br /> of 30' per 1 ,000 gait raparity for gqgclime + astd ^g' <br /> per 1 , 000 gals . capacity for diesel fuel or waste oil tanks . <br /> b. TankPiping Hauler. <br /> Name Jim Thorpe Oil , Inc . <br /> Address P.O. Box 357 City Lodi , CA yip 95241-0357 <br /> PhoneNo4 209 ) 368-6175 <br /> Hauler Registration.t(Sfhauled ashazardous) 2667 <br /> C. TankPiping Disposal Site: <br /> Name Schnitzer Steel Products <br /> Address 12000 Folsom Blvd. City Rancho Cordalpa., CA 9:5742 <br /> PhoneNo.( 916 _)_L85-4810 <br /> EPA D)#(if transported to a permitted TSD facility) <br /> 9. is the sampling firm an independent third party from the contractor? YES M NO]] <br /> 9a. Describe,in detail,how the soil andlor water sample(s)beneath the tank and piping will be obtained: <br /> Samples will be taken from native soil two to three feet d ' ly <br /> under the the former tank location with the backhoe or sulit sp on sampler <br /> amples will be taken from the backhoe bucket or sampler . Water samples <br /> will be taken with a bailer . <br /> 10. Describe how the excavation will be backfilled with suitable material upon removah <br /> Backfill operation will done in the appropriate manner dPnendj = upon the <br /> material being used as fill . <br /> Ii. Handling of excavated soil <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> The tank pit and stock pile will be lined and or rnvPrP(j witlL3 to 6 mil <br /> plastic sheeting if necessary . <br /> b)What will be the final destination of the excavated stockpile? <br /> A decision will be made at the appropriate time . Class 1 disposal will <br /> be Chem Waste , Class 2 disposal will be at Forward, Inc . <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> Name Jim Thorpe Oil , Inc . Haslerflegistration# 2667 <br /> Address P.O. Bos 357 City Lodi ,CA yip 95241-0357 <br /> phone No.( 209 ) 368-6175 <br /> EH 23 046(Revised 10119198) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.