My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
11291
>
2300 - Underground Storage Tank Program
>
PR0508323
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:37 AM
Creation date
11/2/2018 9:28:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0508323
PE
2381
FACILITY_ID
FA0008032
FACILITY_NAME
SAN TOMO PARTNERS
STREET_NUMBER
11291
Direction
N
STREET_NAME
ALPINE
STREET_TYPE
RD
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
11291 N ALPINE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALPINE\11291\PR0508323\REMOVAL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLF— PROTOCOL FOR ROUTINE TANK RET-AIS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 -4 feet. If <br /> contamination is documented during closure, an unauthorized Release Notification must be completed and submitted within five (5) <br /> working days pursuant to California Health& Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TAN-K PIT <br /> TANK TANK SIZE MINIMtibi NUMBER LOCATION OF SOIL SAMPLES <br /> (Gallons) of SOIL SAMPLES <br /> EE <br /> 00 1 cer Tank Fill OR P,.imu End of Tank <br /> - In nm 2 Der Tank 1 at each End of Tank <br /> 000 I 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AN"D STOCKPILE <br /> IIPIPING SOIL SAMPLES I 1 Sample every 20 lineal feet <br /> i <br /> TANK & PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN T:NK PIT <br /> I <br /> TANK TANKSIZE MINDvIUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> (Gallons) I of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 • From wall next to tank <br /> Single Tank I 2 I ends at soil/ groundwater l <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 I ends at soil/ l <br /> groundwater interface <br /> SLAB PRESENT IN THE TANX PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER I LOCATION of SOIL SAMPLES <br /> (Gallons) of SOIL SAMPLES <br /> < 1.000 3 ger Tank ( Center and Ends OR Sides of Tank <br /> 5 r Tank I Center and Ends OR Sides of Tank <br /> 1.000 - 10,000 <br /> > 10.000 I 5 OR More per Tank I Ends and Middle and generally spaced along <br /> the length of the Tank <br /> i <br /> EH 23 046 (Revised 10/19/98) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.