My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
11291
>
2300 - Underground Storage Tank Program
>
PR0508323
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:37 AM
Creation date
11/2/2018 9:28:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0508323
PE
2381
FACILITY_ID
FA0008032
FACILITY_NAME
SAN TOMO PARTNERS
STREET_NUMBER
11291
Direction
N
STREET_NAME
ALPINE
STREET_TYPE
RD
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
11291 N ALPINE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALPINE\11291\PR0508323\REMOVAL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Tomo Partner , 11291 N. Alpine Rd. S- kton CA 95212 <br /> Project Location Phone No. (209)948-0792 <br /> Owner San Tomo Partners <br /> Jim Thor e Oil , Inc . Phone No. (209)368-6175 License No. ^Q^Fg9 <br /> Contractor P <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> X A. Pea gave!--smooch, rounded material not more than one-half(112) inch in diameter <br /> ch in <br /> ross <br /> — B. Crushed <br /> e suremrock-self-compacting <br /> n. (Use of crushed rock will not be pejaed or backfill if mate-jai act more E (con[actt will becmade berHe a <br /> the backfill material and tanks/pipes made of poly resin glass or similar matenais.) <br /> DECLARATION pp <br /> verification that the select material described above will be placed at a minimum of tive (5) cubic yards per na B lding tonic <br /> I hereby certify that a Soil Engineers Compaction Report will be submitted within 30 days of rojec: completion, or submission of <br /> displacement and that he entire excavation will be backfilled and compacted to insure compliance with the Umforn Building Code <br /> Appendix Chapter 70. <br /> Jim Thorne e <br /> N arae rent) <br /> Contractor <br /> e ( nn <br /> c� <br /> scanamre <br /> w Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.