My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
14090
>
2300 - Underground Storage Tank Program
>
PR0506253
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 10:07:19 PM
Creation date
11/2/2018 9:29:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0506253
PE
2332
FACILITY_ID
FA0007276
FACILITY_NAME
METTLER PROPERTY
STREET_NUMBER
14090
Direction
N
STREET_NAME
ALPINE
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
14090 N ALPINE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALPINE\14090\PR0506253\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/2/2011 8:00:00 AM
QuestysRecordID
99690
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA .� °+� <br /> STATE WATER RESOURCES CONTROL BOARD 1 <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B - � ~° <br /> ( <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ I NEW PERMIT ❑ 3 RENEWAL PERMIT O 5 CHANGE OF INFORMATION 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 98 TANK REMOVED O <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D.• B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAY/YEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IFA-11SMARKED, MPLETEITEMC. <br /> A ❑ 1 MOTOR VEHICLE FUEL4 OIL B. C. ❑ III REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> F-1T <br /> 2 PETROLEUM O 80 EMPTY 54 I PRODUCT ❑ It, PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 65 <br /> 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE O 2 i ADED FADED 9JOFUEDE(DESC❑PBRFA D.BELONG <br /> 0. IF(AI)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A B.AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF I DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD N FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE O 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE WIFRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ I RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHE14OUC UNING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.EXTERIOR ❑ I POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 95 UNKNOWN ❑ 99 OTHER <br /> E SPILL AND OVERFILL,BIC. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO_ STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTHIF APPLICABLE <br /> A. SYSTEM TYPE A U I SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U I SINGLE WALL A U 2 DOUBLE WALL A U 3 UNED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELNCOATING A U 8 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION [—]l WGHAN UNE LEAK ❑2 Mai TXIHTES6 ❑3 CCNINUCUS POERSTTAL [:]4 ELI:CmOMC UWE:]5 AUTOIV,TN PUMP E] 99 OTHER <br /> DETECTOR TESTNO MONTOROIO IEAN DE1ECTd1 SRUTl01M1 <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 RECO CILIATIONUAL ORY ❑ 3 MAONNIITORING ZE ❑ 4 AUTOMATGAUGING MONITORING <br /> TANK ❑5 GROUND MONTORINGTER ❑ TANK <br /> B TESTING <br /> ❑ 7 MON TOR NG INTERSTITIAL ❑ B SIR ❑ 9 pENKLGY M UAL ❑10 MONTHLY TANK ❑ 95 UNKNOWN E]99 OTHER <br /> TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE N-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MOIDAWYR) 2.ESTIMATED OUANTITY OF 3.WAS TANK FILLED WITH YES NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL T <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED 6 SIBNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY R JURISDICTION N FACILITY TANK 0 <br /> STATE I.D.# m D 3 06 1.? <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTA TIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PLAN FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-96) <br /> FOROD34"? <br />
The URL can be used to link to this page
Your browser does not support the video tag.