My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2300 - Underground Storage Tank Program
>
PR0231007
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:39 AM
Creation date
11/2/2018 9:31:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231007
PE
2381
FACILITY_ID
FA0003999
FACILITY_NAME
MARLER PROPERTY
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
02
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALPINE\75\PR0231007\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SPECIFIC SAFETY PLA <br />INTRODUCTION <br />This document describes the health and safety procedures for the <br />activities planned in nPrformino a preliminary site investigation at <br />All personnel and <br />subcontractors will follow this plan. The prime responsibility for <br />employee safety lies with each company that is involved in the work <br />for it's own employees. It is expressly intended that all project <br />work will comply with applicable sections of the California <br />occupational Health and safety code. All parties working on this <br />project will maintain a general responsibility to identify and <br />correct any health and safety hazards and are responsible for working <br />in a safe manner. <br />Rey Personnel <br />Project personnel who will have overall responsibility for the safe <br />operation of this are: <br />Site Contact: <br />Project manager and <br />Site Safety Officer <br />FALCON ENERGY ASSOCIATES: JIM HOBLITZELL <br />VICE PRESIDENT AND ENVIRONMENTAL MANAGER <br />REGISTERED ENVIRONMENTAL ASSESSOR, REA- <br />03121 <br />Project Manager and Safety Officer Responsibilities: <br />* To conduct initial site safety training for all project <br />field team members as described in this document, <br />* To assure all field team personnel have read and <br />understand the Health and Safety Plan, <br />* To assure that all work performed on this project is <br />conducted in a safe manner, <br />* To coordinate with field personnel fire -watch, traffic <br />control and site security, <br />SITE AFM PLAN (SSP) - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.