Laserfiche WebLink
BACKFILL EXCAVATION CERTIFIC- -E <br /> Project Location 767 N. Alpine Rd. , Stockton, CA 95215 <br /> Owner Tony Jockovich Trust Phone No.(209)948-2482 <br /> Contractor Jim Thorpe Oil , Inc. Phone No.(209)368-6175 License No. 495699 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.a., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12",lifts: <br /> X A. Pea gravel—smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes trade of poly resin glass or similar materials.) <br /> DECLARATION <br /> — <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofpproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> Jim Thorpe Oil, Inc. <br /> *by Richard Thorpe . Vice President <br /> ame ( rmt) <br /> * Contractor <br /> doll ie q <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />