My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
24
>
2300 - Underground Storage Tank Program
>
PR0516775
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2021 10:03:33 PM
Creation date
11/2/2018 9:39:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0516775
PE
2381
FACILITY_ID
FA0012795
FACILITY_NAME
ROSENTHAL TRUST/BUILDING
STREET_NUMBER
24
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14918005
CURRENT_STATUS
02
SITE_LOCATION
24 S AMERICAN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AMERICAN\24\PR0516775\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/2/2011 8:00:00 AM
QuestysRecordID
100323
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> ` TANKS <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> VI.PIPING CONSTRUCTION(ClXack YflW apply) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ❑ 1 PRESSURE ❑ 2. SUCTION GMV?Y ❑ 1. PRESSURE ❑ 2. SUCTION ❑ 3. GRAVITY <br /> CONSTRUCTION/ 1. SINGLE WALL ❑ 3. LINED TRENCH ❑N. OTHER ❑ 1. SINGLE WALL ❑N. UNKNOWN <br /> MANUFACTURER ❑ 2. DOUBLE WALL 1195 UNKNOWN ❑ 2. DOUBLE WALL [IN. OTHER <br /> MANUFACTURER MANUFACTURER <br /> 1 BARE STEEL ❑ B. FRP COMPATIBLE W/100%METHANOL ❑ 1. BARE STEEL ❑ S. FRP COMPATIBLE W1 IW%METHANOL <br /> MATERIALS AND ❑ 2. STAINLESS STEEL ❑ T. GALVANIZED STEEL ❑ 2. STAINLESS STEEL ❑ T.GALVANIZEDSTEEL <br /> CORROSION <br /> PROTECTION ❑ 3. PLASTIC COMPATIBLE WITH CONTENTS ❑95 UNKNOWN ❑ 9. PLASTIC COMPATIBLE WITH CONTENTS ❑ B FLEXIBLE(HDPE) ❑99. OTHER <br /> ❑ 4. FIBERGLASS ❑ 9. FLEXIBLE(HDPE) 1199 OTHER ❑ 4. FIBERGLASS ❑ 9. CATHODIC PROTECTION <br /> ❑ 5. STEEL W/COATING ❑ 9. CATHODIC PROTECTION ❑ 5. STEEL W/COATING 095. UNKNOWN <br /> WL PIPING LEAK DETECTION(CMdk a,at appy) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING SINGLE WALL%PING <br /> PRESSURIZED PIPING(Check A9 Mat apply)r PRESSURIZED PIPING(Check aA tMt apply): <br /> ❑ 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPM TEST VATH AUTO PUMP SHUT OFF FOR ❑ 1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF FOR LEAK, <br /> LEAK.SYSTEM FAILURE,AND SYSTEM DISCONNECTION-AUDIBLE AND VISUAL SYSTEM FAILURE.AND SYSTEM DISCONNECTION+AUDIBLE AND VISUAL ALARMS <br /> ALARMS 112. MONTHLY 0.2 GPM TEST <br /> ❑ 2. MONTHLY 02 GPH TEST <br /> ❑ <br /> ❑ 3.ANNUAL INTEGRITY TEST(0.1 GPH)]. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑ 4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS'. CONVENTIONAL SUCTION SYSTEMS(C kW tMt apply): <br /> ❑ 5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING INTEGRITY ❑ 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> TEST 10.1 GPH) ❑ 8. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING)'. <br /> ❑ T. SELFMDNITORING ❑ T. SELFMONITORING <br /> G VITY FLOW yn A )� GRAVITYFLOW(Ch .,,MMapply): <br /> 9. BIENNIAL INTEGRITY TEST(011 GPH) Q 1 I"ri�I TQr e� ❑ S. DAILY VISUAL MONITORING <br /> ❑ 9. BIENNIAL INTEGRITY MST(01 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(DMck 4 MN appy): PRESSURIZED PIPING(Check all that appy): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL ALARMS AND <br /> (CMck ma) 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL ALARMS AND(tl Ix*me) <br /> ❑ a. AUTO PUMP SHUT OFF MEN A LEAK OCCURS ❑ a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑ e AUTO PUMP DISCONNECTION <br /> OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑ 5, AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM DISCONNECTION <br /> ❑ c NO AUTO PUMP SHUT OFF ❑ c. NO AUTO PUMP SHUT OFF <br /> ❑ 11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT OFF OR <br /> RESTRICTION ❑ 11. AUTOMATIC LEAK DETECTOR <br /> ❑ 12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/ORAVITY SYSTEMSUCTIOWGRAVITY SYSTEM'. <br /> ❑ 13. CONTINUOUS SUMP SENSOR I AUDIBLE AND VISUAL ALARMS ❑ 13. CONTINUOUS SUMP SENSOR+AUOIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check a that appy) EMERGENCY GENERATORS ONLY(Ch kaS But appy) <br /> ❑ 11. CONTINUOUS SUMP SENSOR WITIIOUTAUTO PUMP SHUT OFF.AUDIBLE AND ❑ 14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF.AUDIBLE AND VISUAL <br /> VISUALAURMS ALARMS <br /> ❑ 15 AUTOMATIC UNE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOWSHUT OFF OR ❑ 15. AUTOMATIC UNE LEAK DETECTOR(3.0 GPH TEST) <br /> RESTRICTION <br /> ❑ 16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 1S. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑ 17. DAILYVISUALCHECK ❑ tT. DAILY VISUALCHECK <br /> VBL DISPENSERCONTAINMENT <br /> DISPENSER CONTAINMENT ❑ 1. FLOATMECHANISM THATSHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK <br /> DATEI STALLED ❑ 2. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUALALARMS ❑ S TRENCH LINER/MONITORING <br /> ❑ 3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR DISPENSER+AUDIBLE AND VISUAL ALARMS . NONE <br /> IX OWNER/OPERATOR SIGNATURE <br /> 1 r mN Vlat 9Xe inPonna9Pn POaWed heroin is true aM BCCVrata to W peat IN my kllPaledpe. <br /> SIGNATUREOFOWNERIOPERATOR DATE <br /> NAME OF OWNER/OPERATOR OMKI TRE OF OWNER/OPEILITOR <br /> Permit Numher(Forbpl uas a+a/9 PomlKAppmvad(Fwbpl uae Doty) Pemla Eapkalgn DaOa lFPrracW use arlA') <br /> CUPAFORM(4199) `/ e00 Formerly SWRCS Form 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.