My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
24
>
2300 - Underground Storage Tank Program
>
PR0516775
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:40 AM
Creation date
11/2/2018 9:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0516775
PE
2381
FACILITY_ID
FA0012795
FACILITY_NAME
ROSENTHAL TRUST/BUILDING
STREET_NUMBER
24
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14918005
CURRENT_STATUS
02
SITE_LOCATION
24 S AMERICAN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AMERICAN\24\PR0516775\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMI._..4G PROTOCOL FOR ROUTINE TANK RL, wVALS <br /> The following represents minimum sampling criterion required for closure compliance. Sots samples collected shall be <br /> representative of native sobs beneath the tank's invert(tank's bottom) at a collection depth not to exceed 2 -4 feet. If <br /> conraminar;pn is documented during closure, an Unauthorized Release Notification must be completed and submitted within five (5) <br /> working days put==to California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK I TANK SIZE I MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> (Gallons) of SOIL SAMPLES <br /> X < 1.000 1 per Tank Fill OR Pumn End of Tank <br /> 1,000- 10,000 2 per Tank I 1 at each End of Tank <br /> > 10,000 I 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING A,\'D STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> X TANK & PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MLNIMUM NUMBERLOCATION of SOIL MINIMUM NUMBER of <br /> x (Gallons) of SOIL SAMPLES T SAMPLES WATER SAMPLES <br /> < 10,000 I From wall next to tank <br /> Single Tank 2 ends at soil/ groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TA.ry-K PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Pbysical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10.000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10.000 5 OR More per Tank I Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 046 (Revised 10/19/98) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.