My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
24
>
2300 - Underground Storage Tank Program
>
PR0516775
>
REMOVAL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:40 AM
Creation date
11/2/2018 9:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2001
RECORD_ID
PR0516775
PE
2381
FACILITY_ID
FA0012795
FACILITY_NAME
ROSENTHAL TRUST/BUILDING
STREET_NUMBER
24
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14918005
CURRENT_STATUS
02
SITE_LOCATION
24 S AMERICAN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AMERICAN\24\PR0516775\REMOVAL 2001.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05 March 2001 <br /> AGE-NC Project No. 01-0810 <br /> Page 3 of 7 <br /> �:S,��i��SJ3'1: � J�.3"I��ak✓.� <.V i�� Q��RSJ �1iFLii. ': <br /> Exclusion Zone Excavated A B C D Other <br /> Reduction Zone Collect samples A B C D Other <br /> and log samples <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> William Little Collect soil samples; direct drilling activities <br /> FIELD CREW: TASK: <br /> Rig Operator/Backhoe Operator Equipment operation. <br /> 11 Sampler I Sample soils. <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br /> Advanced GcoEnvirn enol,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.