My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AMERICAN
>
310
>
2300 - Underground Storage Tank Program
>
PR0518396
>
REMOVAL_2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:42 AM
Creation date
11/2/2018 9:39:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2002
RECORD_ID
PR0518396
PE
2381
FACILITY_ID
FA0013884
FACILITY_NAME
STOCKTON, CITY OF(REDEVELOPMENT)
STREET_NUMBER
310
Direction
S
STREET_NAME
AMERICAN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14926101
CURRENT_STATUS
02
SITE_LOCATION
310 S AMERICAN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AMERICAN\310\PR0518396\REMOVAL 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 310 S. American Stonkton CA <br /> Owner The City of Stockton— 19 Phone No.(2O9)937–&Z6 <br /> Contractor Jim Thorpe Oil, Inc. Phone No.(2O9)368-6175 License No. Qat;Agg <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks7pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> Jim Thorpe Oil , Inc. <br /> • By, Richard Thorpe <br /> Name (Print) <br /> + Con actor <br /> e m <br /> ignamre <br /> ' Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.