My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH AIRPORT
>
3131
>
2300 - Underground Storage Tank Program
>
PR0231514
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 3:45:25 PM
Creation date
11/2/2018 9:41:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231514
PE
2381
FACILITY_ID
FA0003818
FACILITY_NAME
U S POSTAL SERVICE-VEHICLE MAINT
STREET_NUMBER
3131
STREET_NAME
ARCH AIRPORT
STREET_TYPE
RD
City
Stockton
Zip
95213
APN
17927009
CURRENT_STATUS
02
SITE_LOCATION
3131 ARCH AIRPORT RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARCH AIRPORT\3131\PR0231514\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/16/2011 8:00:00 AM
QuestysRecordID
98421
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
>.o/ <br /> STATE OFCAUFORNIA *ftft/ <br /> �1 STATE WATER RESOURCES CONTROL BOARD + <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION-FORM B '"�'I =g <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. 1 <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT6 TEMPORARY TANK CLOSURE <br /> ❑ ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 3 13 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.t B. MANUFACTURED B <br /> C. DATE INSTALLED(MOIDAYNEAR) D. TANK CAPACI IN GALLONS: <br /> II.TANK CONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> A ❑ 1 MOTOR VEHICLE FUEL 4 OIL S. C 1a REGULAR UNLEADEDO 3 DIESEL ❑ e AVIATION GAS <br /> ❑ 2 PETROLEUM 80 EMPTY ❑ 1 PRODUCT ❑ lb PREMIUM UNLEADED ❑ 4 GASNROL ❑ 7 METHANOL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN 2 WASTE ❑ Ic MIDGRADE UN-FADED ❑ 5 JETFUEL ❑ 8 M85 <br /> ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE M REM D.BFLONT <br /> D. IF(A1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A S.0: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C,4ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ I DOUBLE WALL ❑ 3 SINGLE WALL WITH ]OR LINER ❑ 5 INTERNAL BLADDER SYSTEM O 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN VAULT F1 99 OTHER <br /> S. TANK ❑ I BARE STEEL O 2 STAINLESS STE ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL IDE ❑ 7ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PHmary Tank) 8 BRONZE ❑ 10 GALVANIEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ I RUBBER LINED ❑ 2 ALKYDL ING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC UNING <br /> LINING OR F—] 5 GLASS LINING ❑ a UN IN ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% ETHANOL? YES_ NO— <br /> D.EXTERIOR ❑ I POLYETHYLENE WRAP 2 C ATNG ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 ONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,BTC. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ N STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES_ NO <br /> W.PIPING INFORMATION CIRCLE A IF AB EGROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEELA U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED/EEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 NEG4NAm UNE O 2 LNE 11GHTN ❑3 GON ..INIERSRML ❑4 FLECIROMC UNE051 IRCNATIC Ruw ❑ 99 OTHER <br /> GETECfOR TE514I# MONTOPWO LFN(OEfECTOR SXU190KN <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 RECONCILIATIONNUAL INVENTORY ❑ 3 MAODNOZE ITORING ❑ 4 GAUG NG AUTOMATIC TANK ❑ 5 MON <br /> MONITOOUND RING ❑ 6 ANNUALTESTING <br /> ❑ 7 CONTIINMONTOR NG INTERSTITIAL B SIR ❑ 9 TMIEK GAUGANGAL 10 TESNTINGY TANK ❑ 95 UNKNOWN ❑99 OTHER <br /> VI.TANK CLOSURE INFOR ATION(PERMANENT CLOSURE IN-PUCE) <br /> 1.ESTIMATED DATE LAST USED(MOIDAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS I INERT MATERIAL <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.Dl <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A.UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INST LLA ONS�THIS FFM <br /> SHOULD BE ACCOMPANIED BY A PLOT PLAN. FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) (0-/ l I uq I&AZIL, y <br />
The URL can be used to link to this page
Your browser does not support the video tag.