My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1777
>
2300 - Underground Storage Tank Program
>
PR0501908
>
REMOVAL_1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:43:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1989
RECORD_ID
PR0501908
PE
2381
FACILITY_ID
FA0009636
FACILITY_NAME
HAHN TRACTOR CO INC
STREET_NUMBER
1777
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320020
CURRENT_STATUS
02
SITE_LOCATION
1777 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARGONAUT\1777\PR0501908\REMOVAL 1989.PDF
QuestysFileName
REMOVAL 1989
QuestysRecordDate
12/14/2011 8:00:00 AM
QuestysRecordID
98008
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%W <br />SAN .7OAQUI N LOCAL HEALTH DISTRICT <br />SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br />The following represents minimum sampling criterion required for closure compliance. Soil <br />samples collected shall be representative of native soils beneath the tank's <br />invert [tank's bottom] at a collection depth. not be exceed 2 - 9 feet. If contamination <br />is documented during closure, an Unauthorized Release notification must be filled out and <br />submitted to SJLHD within 5 days. Section 2652, CCR. <br />WATER IS PRESENT IN TANK PIT <br />- - - . -- --_.......... ............... .-........... __.........._..... - --......-- - <br />TANK SIZE MINIMUM NO. OF LOCATION OF SOIL MINIMUM NUMBER <br />SOIL SAMPLES SAMPLES OF WATER SAMPLES <br />10,000 GALLONS From wall next to <br />OR LESS tank ends at soil/ <br />(Single Tank) TWO groundwater ONE <br />interface <br />GREATER THAN From wall next to ONE <br />10,000 GALLONS tank ends at soil/ <br />OR groundwater <br />TANK CLUSTER FOUR interface <br />OTHER SPEC I AL GOND I T I ON S <br />SLAB PRESENT IN TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through <br />the obstruction will be required in order to collect the samples. [Physical removal of the <br />obstruction will then allow sampling according to the above conditions.] <br />-------- - ------..... .._............---_._..... ......- -------------------- - ------ ---------- ------- -----.._.... <br />TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br />SOIL SAMPLES <br />Less than 1000 gallons THREE per tank Center and ends or sides <br />1000 - 10,000 gallons FIVE per tank Center and ends or sides <br />10,001 gallons and up FIVE OR MORE per Ends and Middle and <br />tank generally spaced along <br />Ehe length of the tank <br />EH 23 097 12/88 <br />REVISED 1/89 <br />WATER <br />NOT PRESENT IN THE <br />— .... ..... _...... --..._.--.-......_._._...------ <br />TANK PIT <br />... ....__..._.. -- .._..__-._._..--- <br />— ----- -- <br />TANK SIZE <br />... ....... <br />MINIMUM NUMBER OF <br />LOCATION OF SOIL SAMPLES <br />SOIL S LE <br />Less than 1000 gallons <br />ONE per tank <br />Fill or pump end of tank <br />1000 - 10,000 gallons <br />TW ank <br />One at each end of tank <br />10,001 gallons and up <br />THREE OR MORE <br />Ends and Middle or <br />per tankgenerally <br />spaced along <br />the tank <br />the length of <br />Piping <br />ONE <br />EVERY 20 LINEAL FEET <br />WATER IS PRESENT IN TANK PIT <br />- - - . -- --_.......... ............... .-........... __.........._..... - --......-- - <br />TANK SIZE MINIMUM NO. OF LOCATION OF SOIL MINIMUM NUMBER <br />SOIL SAMPLES SAMPLES OF WATER SAMPLES <br />10,000 GALLONS From wall next to <br />OR LESS tank ends at soil/ <br />(Single Tank) TWO groundwater ONE <br />interface <br />GREATER THAN From wall next to ONE <br />10,000 GALLONS tank ends at soil/ <br />OR groundwater <br />TANK CLUSTER FOUR interface <br />OTHER SPEC I AL GOND I T I ON S <br />SLAB PRESENT IN TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through <br />the obstruction will be required in order to collect the samples. [Physical removal of the <br />obstruction will then allow sampling according to the above conditions.] <br />-------- - ------..... .._............---_._..... ......- -------------------- - ------ ---------- ------- -----.._.... <br />TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br />SOIL SAMPLES <br />Less than 1000 gallons THREE per tank Center and ends or sides <br />1000 - 10,000 gallons FIVE per tank Center and ends or sides <br />10,001 gallons and up FIVE OR MORE per Ends and Middle and <br />tank generally spaced along <br />Ehe length of the tank <br />EH 23 097 12/88 <br />REVISED 1/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.