My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL INSTALL 1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2300 - Underground Storage Tank Program
>
PR0232020
>
INSTALL INSTALL 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:44:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
INSTALL 1991
RECORD_ID
PR0232020
PE
2361
FACILITY_ID
FA0003767
FACILITY_NAME
JOHN TAYLOR FERTILIZER*
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
02
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARGONAUT\1819\PR0232020\INSTALL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. Secondary container(s) thickness, density, composition, product compatibility. <br />t A— Sized to contain unauthorized releases from primary containers to allow <br />sufficient time for detection and removal. (Section 2631 (c)] <br />21. Secondary container(s) volumetric requirements: [Section 2631 (e) (1) <br />A. Single primary containers = 100%. <br />B. Multiple primary containers = 150% of largest primary <br />container or 10% above aggregate. <br />22. kla- Secondary container(s) open to rainfall. ( Section 2631 (f)] <br />Volumetric requirements = 24 hours of 100 year storm in addition to <br />primary container volumes. <br />23. Secondary container floor. (Section 2631 (i)] <br />A. Constructed on firm base. <br />B. Sloped to collection sump ( 1/8 inch per foot). <br />_ (1) One or more access casings installed in sump. <br />(a) Size to allow removal of collected liquid. <br />(b) Extended to ground surface. <br />(c) Covered with a locked waterproof cap or <br />within a secured facility. <br />(d) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened <br />stored product or will not donate, capture, <br />or mask constituents to be monitored. <br />24. t Membrane liner specifications. (Section 2631; k,l, and m] <br />D <br />
The URL can be used to link to this page
Your browser does not support the video tag.