My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL INSTALL 1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2300 - Underground Storage Tank Program
>
PR0232020
>
INSTALL INSTALL 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:44:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
INSTALL 1991
RECORD_ID
PR0232020
PE
2361
FACILITY_ID
FA0003767
FACILITY_NAME
JOHN TAYLOR FERTILIZER*
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
02
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARGONAUT\1819\PR0232020\INSTALL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION RECORD <br />FACILITY NAME JCl�// /g447O9 FEI�77L/�2L <br />� <br />FACILITY ADDRESS 1B/L_,1O �7,PFfcDL/i�A�IT S(�KZO,t/, C� <br />SWEEPS # TANK# 7 � � U.I.. # L3%'%04>- PRODUCT G ) <br />oie--icv vor5o'T SNOODirr? -;-,;eu <br />DATE <br />APPROVED <br />DISAPPROVED <br />RENS <br />ITEM OR EQUIPMENT PECTED <br />f 7 q <br />✓ <br />a. STED-L 3=N�P) fI S I` Ci <br />ljt/ <br />1. UST INSTALLATION PLANS SUBMITTED & FEES P <br />J/c <br />3. VISUAL INSPECTION OF 20 CONTAINMENT <br />I/lry <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTION <br />PIPING STAGE INSPECTION <br />- <br />1. HOLIDAY TEST (PLASTEEL) <br />z <br />��y/y <br />✓ <br />a. STED-L 3=N�P) fI S I` Ci <br />ljt/ <br />2. BALL FLOAT VALVES INSTALLED <br />J/c <br />3. VISUAL INSPECTION OF 20 CONTAINMENT <br />Ot) <br />3. OVERFILL PROTECTION INSTALLED, DESCRIBE: <br />4. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br />PIPING STAGE INSPECTION <br />FINAL INSPECTION <br />5Or " <br />1. PRESSURE TEST (10 AND 20 (NEPA 30)7 <br />��y/y <br />✓ <br />l <br />ljt/ <br />2. BALL FLOAT VALVES INSTALLED <br />J/c <br />L <br />Ot) <br />3. OVERFILL PROTECTION INSTALLED, DESCRIBE: <br />-� - <br />✓ <br />i2�0 <br />4. UNUSED TANK OPENING SEALED & CATHODICALLY PROTECTED <br />d/,�-;j <br />v <br />C✓ j <br />S. VISUAL INSPECTION OF 20 CONTAINMENT ON PIPING <br />jvj /q <br />p� <br />6. MONITORING PORTS IN PLACE & BROUGHT TO GRADE (LOCKABLE <br />WEATHER PROOF COVERS) <br />nom, <br />7. FILL & VENT PIPING BROUGHT TO GRADE <br />71 <br />Cp <br />8. PRODUCT LINE LEAK DETECTOR INPLACE (HARD WIRED) <br />(:!o <br />9. APPROVED UST LEAK MONITORING DEVICE INSTALLED <br />10. ALL GALVANIZED PIPING & FITTINGS PROPERLY WRAPPED <br />11. PRESSURE DECAY TEST ON COMPLETE UST & PRODUCT DELIVERY <br />SYSTEM <br />FINAL INSPECTION <br />5Or " <br />1 ke6SION TEST SUCCESSFULLY COMPLETED AND HARD COPIES <br />��y/y <br />✓ <br />l <br />ljt/ <br />RECEIVED (NFPA 329) <br />J/c <br />L <br />Ot) <br />2. SPILL PROTECTION AT FILL PIPE <br />-� - <br />✓ <br />i2�0 <br />3. PERFORMANCE TEST OF OVERFILL PROTECTION SYSTEM <br />4. PERFORMANCE TEST OF PRODUCT LINE LEAK DETECTOR (HARD <br />WIRED) <br />nom, <br />5. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM(S) ON <br />71 <br />TANK(S) <br />6. PERMIT TO OPERATE APPLICATION COMPLETE <br />7. ACCEPTABLE RECORD KEEPING SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.