My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2300 - Underground Storage Tank Program
>
PR0232020
>
REMOVAL REMOVAL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:45:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 2003
RECORD_ID
PR0232020
PE
2361
FACILITY_ID
FA0003767
FACILITY_NAME
JOHN TAYLOR FERTILIZER*
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
02
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARGONAUT\1819\PR0232020\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IL GENERAL INFORMATION: <br /> 1. Obtain as EPA Site Number from the Department of Toxic Substances Control(800)61-TOXIC for temporary <br /> hazardous waste removal activities associated with underground storage tank(UST)removals. <br /> 2. Disposal Information: Public Health Services Underground Storage Tank Disposition Tracking Record(UST Tracking <br /> Record,page 10)shall accompany each tank removed from site. Tank(s)will be issued an identification number which <br /> PHS-EHD's representative will note on the UST Tracking Record. Contractor will affix same identification number <br /> onto tank end using fluorescent spray paint. Contaminated tanks and/or piping are to be transported under Hazardous <br /> Waste Manifest by a stare registered hazardous waste hauler. <br /> 3. Contractor to Provide: Combustible/Flammable gas detector(to verify the Lower Explosive Limit(LEL)atmosphere <br /> and oxygen level of tank prior to lifting from excavation),adequate number(s)and appropriate type(s)of fire <br /> extinguisher(s),barriers to secure the area as necessary to minimize traffic and pedestrian interference,and fluorescent <br /> spray paint to affix tank identification.numbers. It shall be the project manager's responsibility for compliance with all <br /> health&safety regulations and requirements,which shall be strictly adhered to at all times during the course of the <br /> closure activities. <br /> 4 The PHS-EHD permit shall be on site during tank excavation and removal. <br /> 5. Any changes in this document shall be approved by PHS-EHD prior to initiating work. , <br /> I <br /> 6. Closure-in-Place: If Closure-in-Place is the suggested method of abandonment,complete form <br /> EH 23 039 and submit written approval from the local Fire Department. <br /> 7. Temporary Closure: If Temporary Closure is the suggested method of abandonment,complete <br /> and submit this form and a written approval from the local Fire Department. <br /> 8. The following documentation shall be submitted within 30 days of the tank removal date: <br /> I <br /> a) Analytical results,mailed directly from laboratory to PHS-EHD,including a chain of custody and quality <br /> assurance and quality control(QA&QC). <br /> b) UST Tracking Record Sheet(s)and/or Tank Hazardous Waste Manifest(s). <br /> C) Tank Closure Certification Form(DTSC form 1249). <br /> d) Hazardous Waste Manifests for piping,rinsate,residual fuel,or waste oil receipt. <br /> e) Submit the backfill excavation certificate as required by San Joaquin County and the incorporated City <br /> Building Departments. This report will be referred to the appropriate agency for their review. <br /> A site which has had UST(s)removed,shall not be considered for final closure until the above items are <br /> submitted for review. <br /> III. SITE MITIGATION: <br /> 1. In the event contamination is observed,confirmed or suspected as a result of a leaking UST system it is the <br /> responsibility of the owner or operator to submit a work plan to PHS-EHD Site Mitigation Unit and have it approved <br /> prior to initiating any assessment or remediation activities. To minimize delays,the work plan may be submitted <br /> concurrent with tank closure or installation plans. Address one copy of the work plan to the Site Mitigation Unit for <br /> review. If the site is not currently in the Local Oversight Program,a billing form and a$267 minimum fee most be <br /> submitted with the work plan. For further assistance contact the Site Mitigation Unit at(209)468.3450. <br /> EH 23 046 (Revised 8/1/01) Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.