My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2300 - Underground Storage Tank Program
>
PR0232020
>
REMOVAL REMOVAL 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:45:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1991
RECORD_ID
PR0232020
PE
2361
FACILITY_ID
FA0003767
FACILITY_NAME
JOHN TAYLOR FERTILIZER*
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
02
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARGONAUT\1819\PR0232020\REMOVAL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 <br /> PERSONiNTEAL <br /> 4.0 Personnel : <br /> 4. 1 Project Manager <br /> -Manages field operations . <br /> -Ensures the Work Plan is completed on schedule. <br /> ~Briefs the field teams on their specific assignments" <br /> 'Participates in the preparation of the Site Safety <br /> Plan. <br /> -Serves as a liaison with public officials. <br /> 4"2 Site Safety Officer <br /> ~Implements and enforces the SSP" <br /> -Assures that all on-site personnel have received a copy <br /> of the SSP, have read it and understand it . <br /> ~Conducts frequent inspections of site conditions, <br /> facilities, equipment , and activities to determine if <br /> the SSP is adequate and being followed . <br /> -Conducts daily "tailgate" meetings to explain the plan <br /> of work for the day, mention potential hazards of the <br /> site. <br /> ~Ensures that protective clothing and equipment are <br /> properly stored and maintained " <br /> 'Knows emergency procedures, excavation routes, and <br /> notifies local emergency services when necessary . <br /> -Notifies the Health and Safety Manager of all accidents <br /> and injuries that occur on site. <br /> 4^3 On-Site Personnel : <br /> -Are required to document their full understanding of <br /> the SSP before starting work by signing that they have <br /> read the SSP and understand it. <br /> -Complies with the SSP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.