Laserfiche WebLink
NR. PI:OJECT SPECIFIC PRACTICOW <br /> To prevent personnel exposure to heat stress during all tasks, the practices outlined in this plan shall be followed. <br /> The work area must be marked in such a way as to prevent traffic from passing within 10 feet of the work area. <br /> Barricades, caution tape, and temporary chain link fence, or other means must be used to define the work area. All <br /> on-site personnel must wear steel-toed safety boots, hard hats,and long pants or trousers. <br /> a. Site Preparation <br /> The first priority for project personnel during site preparation should be to post and secure the area, <br /> particularly from motor vehicle traffic. The barricaded work area will include the support, contamination <br /> reduction and exclusion zones. <br /> b. Asphalt Removal If;Necessary <br /> Prior to the start of cutting operations the saw will be inspected. The saw blade should be free of cracks and <br /> distortions and the saw edge should be fresh. All guards should be in place and functional. During cutting <br /> operations, the number of people in the work area should be kept to a minimum. The saw operator and any <br /> other personnel in the barricaded area should wear: <br /> -Hard Hat <br /> -Safety Glasses <br /> -Hearing Protection <br /> -Leather Gloves <br /> - Long Pants <br /> - Steel-toed Boots <br /> c. Excavation Safety <br /> All excavation conducted will comply with the applicable OSHA regulations governing excavation and <br /> trenching. All excavation shall be performed from a stable ground position. All spoils shall be located at <br /> least two feet from the edge of the excavation, to prevent it from falling back into the excavation. The <br /> excavation shall be guarded on all sides by barricades, caution tape or temporary fencing, as per contract <br /> specifications. <br /> If excavating equipment is located in the vicinity of overhead power lines, a distance of fifteen feet must be <br /> maintained between the lines and any point of the equipment. If the lines have appreciable sag, or if windy <br /> conditions exist,this distance shall be twenty feet. <br /> D-4 <br /> RECEIVED FEB-11-04 15:09 FROM-9168581011 TO-KLEEMAN ROEBBELEN PAGE 24 <br />