Laserfiche WebLink
Page 3 <br />INTRODUCTION <br />SEMCO has adopted the following Health & Safety Plan and <br />procedures for the excavation and/or closure of <br />underground petroleum storage tanks and associated <br />activities. The purpose of this plan is to provide <br />health and safety guidelines to be adhered to while all <br />work is in progress. <br />All personnel involved with the tank removal or <br />associated activities will have an assigned <br />responsibility. The outlined responsibilities will <br />establish standards for personnel protective wear and <br />safety procedures, and will provide for emergency <br />actions which could arise during project operations. <br />