My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
2300 - Underground Storage Tank Program
>
PR0231555
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:34 PM
Creation date
11/4/2018 2:08:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231555
PE
2361
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\E\103\PR0231555\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CKFILL EXCAVATION CERTIFICATE <br /> Project Location 103 North E Street <br /> Owner A. Teichert & Son, Inc. Phone No. 916-386-6916 <br /> Contractor Triangle Inc . Of Sac . Phone No. 916-421-1990 License No. 183550 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.�., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12 lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 das of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> ame not <br /> . PIZ7 I e c7—' ee� <br /> ite' rent <br /> * 2� � <br /> Sigaamre <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> Teichert will backfill excavation using fill soil from open field. <br /> Soil will be compacted to our satisfaction for the intended use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.