My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
2300 - Underground Storage Tank Program
>
PR0231555
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 2:09:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231555
PE
2361
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\E\103\PR0231555\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`/ BACKFILL EXCAVATION CERTIFICA't, / <br />Project Location 103 North E Street <br />Owner A. Teichert & Son, Inc. Phone No. 916-386-3716 <br />Contractor Savidge Construction Phone N0530-622-1982 License No. 755898 HAZ <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g.: load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12' lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* George Takemori <br />Name(Print) <br />* Project Manager <br />tt a rent <br />0Signature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />*****TEICHERT WILL BACKFILL EXCAVATION USING FILL SOIL FROM OPEN <br />FIELD. SOIL WILL BE COMPACTED TO OUR SATISFACTION FOR THE <br />INTENDED USE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.