My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EDISON
>
405
>
2300 - Underground Storage Tank Program
>
PR0515742
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 2:11:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0515742
PE
2361
FACILITY_ID
FA0010849
FACILITY_NAME
FOWLERS BODY SHOP
STREET_NUMBER
405
Direction
N
STREET_NAME
EDISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
135-460-06
CURRENT_STATUS
02
SITE_LOCATION
405 N EDISON ST
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EDISON\405\PR0515742\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iwo <br /> S. a. Describe the method that will be utilized to purge and/or inert the taok(s): <br /> AFTER TRIPLE RINSING, USE DRY ICE AT 15, POUNDS PFo —HOUSnnin aA11Or,ic rnoACITY <br /> FOR DIESEL TANK AND 30 POUNDS ^ 1W Tnn— <br /> b. TanklPiping Hauler. <br /> Name WEST COAST EQUIPMENT <br /> Address BOX 2358 City TURLOCK, CA 219 95381 <br /> Phone No{ 209 ) 568 9378 <br /> Hauler Registration M Of hauled as hazardous) NA <br /> C. Tank/Plping Disposal Site: <br /> Name SAME AS .ABOVE <br /> Address city ap <br /> Phone No ) <br /> EPA IDN(If transported to a permitted TSD facility) <br /> 9. is the sampling firm an independent third party from the contractor? YES Y N011 <br /> 9a. Describe,in detail,how the soil andfor water sample(s)beneath the tank and piping will be obtained: <br /> RESPONSIBILITY OF SAMPLING FIPf, <br /> 10. Describe how the excavation will be backfilled with suitable material upon removed: <br /> WITH EXCAVATED SOIL IF CLEAN AND PEA GRAVEL <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> 4 MIL PLASTIC IF REQUIRED <br /> b)What will be the final destination of the excavated stockpile? <br /> ACKFILL EXCAVATION IF CL f ; NOT WITHIN SCOPE OF THIS CONTRACT <br /> c)Contaminated So Hauler. <br /> NOT WITH SCOPE OF THIS CONTRACT Hauler Registration d <br /> Name <br /> Address city Zip <br /> Phone No.( ) <br /> EH 23 046(Revised 10119198) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.