My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EDISON
>
405
>
2300 - Underground Storage Tank Program
>
PR0515742
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 2:11:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0515742
PE
2361
FACILITY_ID
FA0010849
FACILITY_NAME
FOWLERS BODY SHOP
STREET_NUMBER
405
Direction
N
STREET_NAME
EDISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
135-460-06
CURRENT_STATUS
02
SITE_LOCATION
405 N EDISON ST
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EDISON\405\PR0515742\REMOVAL 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*4/ <br /> B-8 TANK REMOVAL SAMPLING <br /> B-8.1 Collection of Soil Samples and Laboratory Analysis <br /> Soil and water samples will be collected during the tank removal operations in accordance with <br /> the current Leaking Underground Fuel Tank Field (LUFT) Manual and the Tri-Regional <br /> Guidelines issued by the California Regional Water Quality Control Board(RWQCB). <br /> A Kleinfelder, environmental geologist will be on site during the tank removal activities to <br /> collect soil samples for qualitative field screening and laboratory analysis. Tank excavation soil <br /> samples will be obtained by scraping the sidewalls or excavation bottom at the desired locations <br /> with the backhoe bucket. Samples will then be collected from the bucket by packing soil in a <br /> clean brass tube with a clean hand trowel. The soil samples may also be collected using a slide <br /> hammer lined with a clean brass tube with appropriate extension to reach the desired sampling <br /> depth. The collected brass tubes will then be sealed with Teflon sheets and tight fitting plastic <br /> caps. <br /> B-8.2 Collection of Water Samples and Laboratory Analysis <br /> If water is encountered in the excavation after the tank is removed, a representative sample will <br /> be collected for laboratory analysis. The tank excavation may be purged and allowed to refill <br /> before sampling. The water sample will be collected using a clean disposable bailer with new <br /> nylon cord. The bailer will be retrieved and the water will be contained in appropriate bottles <br /> supplied by the analytical laboratory for the requested analysis. <br /> In accordance with the Tri-Regional Guidelines one water sample will be collected from the tank <br /> excavation. The water sample will be delivered under chain-of-custody procedures to a state <br /> certified laboratory. <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.