My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2300 - Underground Storage Tank Program
>
PR0231557
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 11:08:07 AM
Creation date
11/4/2018 2:11:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231557
PE
2381
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
02
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\11530\PR0231557\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/27/2012 8:00:00 AM
QuestysRecordID
86112
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—� STATEOFCAUFORMA *af ONS STATE WATER RESOURCES CONTROL BOARDUNDERGROUND STORAGE TANK PERMIT APPLICATION" FORM BCOMPLETE A SEPARATE FORM FOR ACH TANK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE O 8 TANK REM <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.a B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MOIDAYNEAR) lL D. TANK CAPACITY IN GALLONS: <br /> 11.TANK CATENTS IFAI ISMARKED.COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL 4 OIL B. C• ❑ Ia REGUED 3 DIESELUNLEA ❑ g AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ 8o EMPTY (�21 <br /> ODUCT Ib PREMIUM 4 GASAHOL 7 METHANOL <br /> O UNLEADED 5 JET FUEL ❑ <br /> ❑ 3 CHEMICAL PRODUCT 95 UNKNOWN STE 2 LEADED 99 OTHER (DESCRIBE IN ITEM D. BELOWI <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.0.S.s <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,S.AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> S. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL = 3 FIBERGLASS 4 STEEL CLAD WI FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE I❑ 7 ALUMINUM ❑ 6 100% METHANOL COMPATBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN 99 OTHER <br /> I❑I 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C INTERIOR <br /> L! 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKN��O//�1QM�fN� � !�❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NOJL�LI//�•• <br /> D.CORROSION ❑ I POLYETHYLENE WRAP ❑ COATING � 3 VINYL WRAP � 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE Q95 UNKNOWN ❑ 99 OTHER <br /> E SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GRO DERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTIO A U 2 PRESSURE A U 3 GRAWry A U 99 OTTER <br /> B. CONSTRUCTION A U 1 SINGLE A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 96 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A 1 BARE STE A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> 0. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR 2 LINE TIGHTNESS TESTING ❑ MONITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION OYI OY� <br /> ❑ I VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 ROUND WATER MONITORING <br /> ❑ I TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN 99 OTHER //— <br /> VI.TANK CLOSURE INFORMATION ` <br /> 1.ESTIMATED DATE LAST USED(MO/DAYIYR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> IPRINTEO a SIGNAMRhT <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE 04 � p 31 T I <br /> PERMHTNUMBER PERMIT APPROVED SYIDATE- PERMITEXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FORM B (12-91) <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGVLATIONS- <br /> `l/✓1/����=__� <br /> &R6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.